Buildings

TEC – Technology Museum in Doha

  • LOCATION Qatar
  • CLIENT Oneworks

A CFD analysis has been performed in order to support the design of the smoke exhaust system. An iterative procedure has been implemented in order to evaluate the minimum airflow rate through which it is possible to guarantee the fulfillment of tenability conditions for the users.