![](https://www.cantene.it/wp-content/uploads/2022/10/TELT_Lyon-Turin_280422CMX_4826.jpg)
Manufacturing prcs
Torino – Lione high speed railway tunnel
- LOCATION IT-FR
- CLIENT EXPLEO
1D+ CFD and evacuation simulations have been performed to evaluate the risk profile on the FN plan associated to the tunnel according to additional hypotesis coming from TELT committee.