Buildings

residential buildings Santa Giulia Spark 1,2

  • LOCATION Italy
  • CLIENT GAE Engineering

Aim of the analysis has been to dimension the emergency ventilation system of the buildings. The analysis has involved the car park in the basement levels, the commercial premises at the ground level and the offices at the upper levels. The ventilation system has been evaluated according to safety objectives. ASET/RSET criterion has been verified everywhere. Moreover, the ordinary use of the car parks has been investigated in order to verify the dilution of pollutants by the ventilation system.